OXO 601 West 26th Street - Clune Contracting
We were awarded the build out of the OXO headquarters.
To accommodate the houseware and utensil manufacturer’s requirements with almost 100 partition types on layout the drywall scope for this project was much more involved than usual.
This 35,000 sqft build out over two floors, although having a modern feel, the project had many well thought out features including the barn detail to the office front, a design studio and great attention to detail at each conference room.
The ceilings were also involved with metalworks, starsilent plaster and pyrock acoustement under our scope.
We brought the project to close on schedule, this is the type of detailed buildout we enjoy the challenge of and take pride in completing to a high standard.
Bryant Park Winter Village - Urban Management
When the opportunity came up to be involved in the construction on the Winter Village we did not let the one week schedule deter us. We had the drywall and painting contract, working around the clock, with efficient time management and getting positive feedback, the park opened for a fun Winter season.
Oppenheimer 666 3rd Ave - The Omara Organization
We successfully took on the four floor build out for Oppenheimer Holding, a multinational investment bank and financial services company who chose 666 3rd Ave to be their new headquarters.
This was a fast paced sixteen week schedule to complete the four floors. It was the type of project we thrive on. The deadline was met with no issues and resulted in another successful completion, continuing our relationship with Omara and developing a strong reputation with Tishman Speyer.
Silicon Valley Bank 387 Park Ave South - Structure Tone
The build out of this banking commercial floor is another example of Anfield furnishing and installing a variety of custom ceilings.
Eurospan ceiling systems, Rulon wood grill ceiling and Hunter Douglas box series were some of the special order materials on this job.
From thorough research into pricing and utilizing a detailed submittal process we were able to coordinate and schedule a successful install. In doing so, we have gained vast experience with more complex systems, priding ourselves on the end result.
860 Washington Street -
Delos Headquarters - Structure Tone
We undertook and completed the first LEED V4 project done in Manhattan. Once again Anfield was able to continuously evolve and grow, gaining a good insight into sustainable building.
Sonospray, concrete stairs and landing with perimeter curb, installed sikawrap Hex 103 C carbon fiber wrap to the slab for reinforcement, custom wood ceilings and wall panels, are some of the scope items taken on for this project.
Bloomingdales 20-01 Jackson Ave – Structuretone
When Long Island City was chosen to be the location for Bloomingdales, we were happy to take on 8 floors of the 550,000sq ft office space for the chief executive and 1,000 + employees.
This was another beautiful fit out. We furnished & installed custom ceilings, high end finishes and constructed impressive bleacher seating.
The project was completed on schedule for early 2020 move in.
441 9th Avenue, 29 Floor High Rise - Pavarini Mcgovern
The core and shell work including local 1 protection, spanning 29 floors, is one example that reflects the scale of projects and capabilities Anfield can carry, not just in this area but across the many services we provide.
This has moved at a fast pace with consistent man power to see it through to completion mid 2019 where it begins its next phase of build out.
We will proceed to build out the entrance lobby with custom ceilings and engineers framing to receive stone.
Beazley 45 Rockefeller - Gannon Vitolo Contracting
This build out is a prime example of the type of ceiling work we have become expert with install. This was a beautifully designed high end space with a lot of attention to detail.
We were responsible for the Arktura ceiling with custom blades wrapping the space to create a wave like motion. Field dimensions were key and strong communication between us, the architect and vendor was required to achieve the desired result.
Throughout the many conference rooms and open work stations we furnished and installed 3Form ceiling panels in a variety of shapes. In coordination with the electrician we also furnished and installed the light form equivalent to compliment
Overall the project was a success, completed on schedule with ease.
Macys 422 Fulton St Brooklyn
We completed the Core and shell work for the renovation of the building. The new lobby was also our scope where we constructed an intricate curved ceiling at 20ft
The progress photos show construction through to completion. Accuracy and coordination were key on our side as the ceiling design is the focal point of this impressive space